Amiss Water Treatment Plant Improvements |
| more.... |
 |
|
 |
 |
 |
 |
 |
|
 |
| Other Water Experience |
 |
|
| Rehabilitate Water Station |
 |
| Fort Polk, Louisiana |
 |
| Survey and design services for the replacement of four (4) centrifugal
pumps at the South Fort Polk Water Station. Project included new manifold
piping motors and electrical control systems. |
|
 |
Rehabilitate Water Pump Station and Replace Two
Ground Storage
Tanks |
 |
| Fort Polk, Louisiana |
 |
Prepared Plans and Specifications for the upgrading and rehabilitation
of the water system at the South Fort Polk Water Station, and for the
demolition and replacement of two 1 MGD underground water storage tanks.
Improvements included replacing service pumps, two (2) one million gallon
ground storage tanks, foundation cathodic protection, ultrasonic level
controls and related piping. The required services included site investigation,
phasing plans, opinion of probable construction cost, tank foundation
design, design of all 16" lines and piping connections, design and
specifications for four (4) pumps, modifications to security fencing,
redesigned and relocated the injection point for phosphorous and fluoride
chemical additives. |
|
 |
| Talton/Carolina Street Water Main Extension |
 |
| Minden, Louisiana |
 |